Skip to content

Draft#353

Open
gilbens-starkware wants to merge 4 commits into
mainfrom
pr-350
Open

Draft#353
gilbens-starkware wants to merge 4 commits into
mainfrom
pr-350

Conversation

@gilbens-starkware
Copy link
Copy Markdown
Contributor

@gilbens-starkware gilbens-starkware commented May 28, 2026

Type

  • feature
  • bugfix
  • dev (no functional changes, no API changes)
  • fmt (formatting, renaming)
  • build
  • docs
  • testing

Description

Breaking changes?

  • yes
  • no

This change is Reviewable

ilyalesokhin-starkware and others added 3 commits April 30, 2026 13:03
Add CIRCUIT_LOG_COMPONENT_SIZES constant and check the proof's packed
component log sizes against it during recursive circuit verification.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
@gilbens-starkware gilbens-starkware changed the base branch from main to ilya/check_log_size May 28, 2026 10:45
@gilbens-starkware gilbens-starkware changed the base branch from ilya/check_log_size to main May 28, 2026 10:50
CIRCUIT_TRACE_LOG_SIZE increased from 21 to 22 with the new keccak
simulation bootloader, doubling circuit proving memory beyond the 16 GB
large runner limit.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
@gilbens-starkware gilbens-starkware changed the base branch from main to fix/slow-tests-xlarge-runner May 28, 2026 11:21
@gilbens-starkware gilbens-starkware changed the base branch from fix/slow-tests-xlarge-runner to main May 28, 2026 11:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants