Skip to content

WIP: test#78886

Draft
pacevedom wants to merge 1 commit intoopenshift:mainfrom
pacevedom:pre-commit-test
Draft

WIP: test#78886
pacevedom wants to merge 1 commit intoopenshift:mainfrom
pacevedom:pre-commit-test

Conversation

@pacevedom
Copy link
Copy Markdown
Contributor

@pacevedom pacevedom commented May 6, 2026

Summary by CodeRabbit

  • Chores
    • Enhanced pre-commit check commands with verbose output flag for improved debugging visibility during continuous integration runs.

@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci Bot commented May 6, 2026

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@openshift-ci openshift-ci Bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label May 6, 2026
@pacevedom
Copy link
Copy Markdown
Contributor Author

/pj-rehearse ?

@openshift-merge-bot
Copy link
Copy Markdown
Contributor

@pacevedom: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@coderabbitai
Copy link
Copy Markdown
Contributor

coderabbitai Bot commented May 6, 2026

No actionable comments were generated in the recent review. 🎉

ℹ️ Recent review info
⚙️ Run configuration

Configuration used: Repository YAML (base), Central YAML (inherited)

Review profile: CHILL

Plan: Enterprise

Run ID: 45778920-7260-4731-837d-87a6b5168c25

📥 Commits

Reviewing files that changed from the base of the PR and between 0fe1b46 and 52e959d.

📒 Files selected for processing (1)
  • ci-operator/config/openshift/lvm-operator/openshift-lvm-operator-main.yaml

Walkthrough

The precommit-check test command in the LVM operator CI configuration gains a --verbose flag to enhance diagnostic output during pre-commit execution.

Changes

CI Test Configuration

Layer / File(s) Summary
Test Command Configuration
ci-operator/config/openshift/lvm-operator/openshift-lvm-operator-main.yaml
The precommit-check test adds --verbose flag to the pre-commit invocation for increased diagnostic output.

Estimated code review effort

🎯 1 (Trivial) | ⏱️ ~2 minutes

🚥 Pre-merge checks | ✅ 11 | ❌ 1

❌ Failed checks (1 inconclusive)

Check name Status Explanation Resolution
Title check ❓ Inconclusive The title "WIP: test" is vague and generic, using non-descriptive terms that don't convey meaningful information about the changeset. Replace with a specific title describing the actual change, such as 'Add --verbose flag to pre-commit-check test commands' to clarify the purpose of the modifications.
✅ Passed checks (11 passed)
Check name Status Explanation
Description Check ✅ Passed Check skipped - CodeRabbit’s high-level summary is enabled.
Docstring Coverage ✅ Passed No functions found in the changed files to evaluate docstring coverage. Skipping docstring coverage check.
Linked Issues check ✅ Passed Check skipped because no linked issues were found for this pull request.
Out of Scope Changes check ✅ Passed Check skipped because no linked issues were found for this pull request.
Stable And Deterministic Test Names ✅ Passed Custom check not applicable. PR only modifies CI configuration (adding --verbose flag), not Ginkgo test code or test names.
Test Structure And Quality ✅ Passed The PR modifies a CI configuration file, not Ginkgo test code. The custom check for Ginkgo test quality requirements is not applicable to this CI/CD configuration file change.
Microshift Test Compatibility ✅ Passed PR only modifies CI config, adding --verbose flag to pre-commit command. No new Ginkgo e2e tests are added. Check not applicable.
Single Node Openshift (Sno) Test Compatibility ✅ Passed This PR only modifies CI configuration (adding --verbose flag to pre-commit command), not Ginkgo e2e tests. The SNO test compatibility check applies only when new e2e tests are added.
Topology-Aware Scheduling Compatibility ✅ Passed PR modifies only a CI test configuration, adding --verbose flag to pre-commit command. No deployment manifests, operator code, or scheduling constraints changed. Topology-aware concerns do not apply.
Ote Binary Stdout Contract ✅ Passed PR modifies only CI configuration files (YAML) to add --verbose flag to pre-commit commands. No OTE binary code or test suite implementations are changed. The check is not applicable.
Ipv6 And Disconnected Network Test Compatibility ✅ Passed PR does not add new Ginkgo e2e tests. It only modifies CI configuration to add --verbose flag to pre-commit-check command. Custom check is not applicable.

✏️ Tip: You can configure your own custom pre-merge checks in the settings.

✨ Finishing Touches
🧪 Generate unit tests (beta)
  • Create PR with unit tests

Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out.

❤️ Share

Comment @coderabbitai help to get the list of available commands and usage tips.

@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci Bot commented May 6, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: pacevedom

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci Bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label May 6, 2026
@openshift-merge-bot
Copy link
Copy Markdown
Contributor

@pacevedom: job(s): ? either don't exist or were not found to be affected, and cannot be rehearsed

@openshift-merge-bot
Copy link
Copy Markdown
Contributor

[REHEARSALNOTIFIER]
@pacevedom: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
pull-ci-openshift-lvm-operator-main-precommit-check openshift/lvm-operator presubmit Ci-operator config changed

Prior to this PR being merged, you will need to either run and acknowledge or opt to skip these rehearsals.

Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@pacevedom
Copy link
Copy Markdown
Contributor Author

/pj-rehearse pull-ci-openshift-lvm-operator-main-precommit-check

@openshift-merge-bot
Copy link
Copy Markdown
Contributor

@pacevedom: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci
Copy link
Copy Markdown
Contributor

openshift-ci Bot commented May 6, 2026

@pacevedom: all tests passed!

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant