Skip to content

cnf ran: two_sno added operator deployment step#75772

Open
kononovn wants to merge 1 commit intoopenshift:mainfrom
kononovn:two_sno_operators
Open

cnf ran: two_sno added operator deployment step#75772
kononovn wants to merge 1 commit intoopenshift:mainfrom
kononovn:two_sno_operators

Conversation

@kononovn
Copy link
Contributor

@kononovn kononovn commented Mar 5, 2026

No description provided.

@openshift-ci-robot
Copy link
Contributor

@kononovn, pj-rehearse: unable to determine affected jobs. This could be due to a branch that needs to be rebased. ERROR:

could not load configuration from base revision of release repo: could not checkout worktree: '[git checkout ff6f4e7fde06c0cdb4ff84363287f1101f8c760d]' failed with out:  and error exec: Stdout already set
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@openshift-ci openshift-ci bot requested review from eifrach and stbenjam March 5, 2026 20:37
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 5, 2026

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: kononovn

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Mar 5, 2026
@kononovn kononovn force-pushed the two_sno_operators branch from 9ee278d to 23253c7 Compare March 5, 2026 20:39
@kononovn
Copy link
Contributor Author

kononovn commented Mar 5, 2026

/pj-rehearse periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-two-sno-4.20-cnf-ran-ztp-tests

@openshift-ci-robot
Copy link
Contributor

@kononovn: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@kononovn kononovn force-pushed the two_sno_operators branch from 23253c7 to c11b1b7 Compare March 5, 2026 20:57
@openshift-ci-robot
Copy link
Contributor

[REHEARSALNOTIFIER]
@kononovn: the pj-rehearse plugin accommodates running rehearsal tests for the changes in this PR. Expand 'Interacting with pj-rehearse' for usage details. The following rehearsable tests have been affected by this change:

Test name Repo Type Reason
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.22-cnf-ran-ztp-tests N/A periodic Registry content changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.16-cnf-ran-ztp-tests N/A periodic Registry content changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-two-sno-4.20-cnf-ran-ztp-tests N/A periodic Ci-operator config changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.21-cnf-ran-ztp-tests N/A periodic Registry content changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.20-cnf-ran-ztp-tests N/A periodic Registry content changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.18-cnf-ran-ztp-tests N/A periodic Registry content changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.14-cnf-ran-ztp-tests N/A periodic Registry content changed
periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-standard-4.19-cnf-ran-ztp-tests N/A periodic Registry content changed
Interacting with pj-rehearse

Comment: /pj-rehearse to run up to 5 rehearsals
Comment: /pj-rehearse skip to opt-out of rehearsals
Comment: /pj-rehearse {test-name}, with each test separated by a space, to run one or more specific rehearsals
Comment: /pj-rehearse more to run up to 10 rehearsals
Comment: /pj-rehearse max to run up to 25 rehearsals
Comment: /pj-rehearse auto-ack to run up to 5 rehearsals, and add the rehearsals-ack label on success
Comment: /pj-rehearse list to get an up-to-date list of affected jobs
Comment: /pj-rehearse abort to abort all active rehearsals
Comment: /pj-rehearse network-access-allowed to allow rehearsals of tests that have the restrict_network_access field set to false. This must be executed by an openshift org member who is not the PR author

Once you are satisfied with the results of the rehearsals, comment: /pj-rehearse ack to unblock merge. When the rehearsals-ack label is present on your PR, merge will no longer be blocked by rehearsals.
If you would like the rehearsals-ack label removed, comment: /pj-rehearse reject to re-block merging.

@kononovn
Copy link
Contributor Author

kononovn commented Mar 5, 2026

/pj-rehearse periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-two-sno-4.20-cnf-ran-ztp-tests

@openshift-ci-robot
Copy link
Contributor

@kononovn: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@kononovn
Copy link
Contributor Author

kononovn commented Mar 5, 2026

/pj-rehearse periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-two-sno-4.20-cnf-ran-ztp-tests

@openshift-ci-robot
Copy link
Contributor

@kononovn: now processing your pj-rehearse request. Please allow up to 10 minutes for jobs to trigger or cancel.

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Mar 5, 2026

@kononovn: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/rehearse/periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-two-sno-4.20-cnf-ran-ztp-tests c11b1b7 link unknown /pj-rehearse periodic-ci-openshift-kni-eco-ci-cd-main-cnf-ran-two-sno-4.20-cnf-ran-ztp-tests
ci/prow/ordered-prow-config c11b1b7 link true /test ordered-prow-config

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants