Skip to content

FE-704: Sync planning after multi-chat substrate + V2 plumbing#100

Merged
kostandinang merged 2 commits into
mainfrom
ka/fe-704-sync-substrate-v2
May 8, 2026
Merged

FE-704: Sync planning after multi-chat substrate + V2 plumbing#100
kostandinang merged 2 commits into
mainfrom
ka/fe-704-sync-substrate-v2

Conversation

@kostandinang
Copy link
Copy Markdown
Contributor

@kostandinang kostandinang commented May 7, 2026

Summary

Planning PR to reconcile memory/PLAN.md after FE-697 (multi-chat substrate + reconciliation_need queue) and FE-673 (side-chat V2 plumbing) reached completion. Drift surfaced by /ln-sync on 2026-05-07 — the file had FE-697 listed simultaneously as Active and as Recently Completed, no entry for FE-673, and the dependency diagram still showed multi-chat substrate as (next scope) in Track A while Track B already marked it (completed). Linear: FE-704.

What changed

  • memory/PLAN.md
    • Narrative: substrate landed; V2 branch-complete with known UI-trigger gap; live frontier shifts to continuous workspace.
    • Active: promoted Continuous workspace from NextActive.
    • Next: added Side-chat V2 UI trigger (closes the orphan gap from FE-673 where side-chat-popover.tsx:472-481 stayed stubbed disabled), and Side-chat V3 hard-impact + cascade preview (uses the reconciliation_need queue).
    • Recently Completed: added FE-673 V2 plumbing entry with explicit watch on the disabled Edit-mode button.
    • Dependency diagram: Track A multi-chat substrate now (completed) with side-chat V2/V3 sub-tree; Track B continuous-workspace flipped from (next) to (active); orphan revisit / edit-mode horizon line retired (subsumed by V3).
  • docs/archive/PLAN_HISTORY.md
    • Rotated three older completions (FE-639 relation-first observer capture, FE-616 workflow ownership extraction, runtime JSON payload hardening) under a new ## 2026-05-07 Sync Archive heading per the rolling-frontier rule.

memory/SPEC.md untouched — no embedded historical detail to prune. A79 / A80 stay marked validated since they still constrain forward work (legacy pointer cleanup, patch-ledger extensibility).

Intent

This is a planning/scope merge point, not a feature change. Land it on main first so downstream feature branches (ka/fe-697-decouple-turns-from-specs and any new work) rebase onto a shared planning baseline rather than fight over the same paragraphs. Follows the convention codified in .agents/skills/planning-pr (FE-703, PR #99) and previously demonstrated by FE-698 (PR #98).

Test plan

  • CI passes (no code touched)
  • PR merges to main before downstream stack work resumes
  • Downstream gt restack on open feature branches is conflict-free on memory/PLAN.md and docs/archive/PLAN_HISTORY.md

@cursor
Copy link
Copy Markdown

cursor Bot commented May 7, 2026

PR Summary

Medium Risk
Doc-only changes, but memory/PLAN.md currently contains unresolved merge-conflict markers in the Recently Completed section, which could break tooling that parses the plan.

Overview
Updates planning docs to reflect FE-697 multi-chat substrate and FE-673 side-chat V2 plumbing as completed, promoting continuous workspace to the single Active frontier and adding follow-up Next items for a V2 UI trigger and V3 hard-impact/cascade work.

Rotates older completed items out of memory/PLAN.md into a new 2026-05-07 Sync Archive section in docs/archive/PLAN_HISTORY.md, and refreshes the dependency diagram/horizon notes to match the new sequencing. Note: memory/PLAN.md includes <<<<<<</=======/>>>>>>> conflict markers that should be resolved before merge.

Reviewed by Cursor Bugbot for commit 42c109e. Bugbot is set up for automated code reviews on this repo. Configure here.

Copy link
Copy Markdown
Contributor Author

kostandinang commented May 7, 2026

@augmentcode
Copy link
Copy Markdown

augmentcode Bot commented May 7, 2026

🤖 Augment PR Summary

Summary: Planning-doc sync after FE-697 (multi-chat substrate + reconciliation_need) and FE-673 (side-chat V2 plumbing) landed.

Changes:

  • Promotes Continuous workspace from Next to Active as the current execution frontier.
  • Adds Next items for the missing Side-chat V2 UI trigger and a V3 hard-impact + cascade preview driven by reconciliation_need.
  • Updates Recently Completed to capture FE-673/FE-697 status and explicitly calls out the remaining disabled Edit-mode button gap.
  • Refreshes the dependency diagram to reflect the completed substrate and the V2/V3 subtree.
  • Archives older completed entries into docs/archive/PLAN_HISTORY.md under a new 2026-05-07 Sync heading.

Technical Notes: memory/SPEC.md remains unchanged; A79/A80 stay validated constraints.

🤖 Was this summary useful? React with 👍 or 👎

Copy link
Copy Markdown

@augmentcode augmentcode Bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Review completed. 1 suggestion posted.

Fix All in Augment

Comment augment review to trigger a new review at any time.

Comment thread memory/PLAN.md Outdated
Copy link
Copy Markdown

@cursor cursor Bot left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Cursor Bugbot has reviewed your changes and found 1 potential issue.

Fix All in Cursor

❌ Bugbot Autofix is OFF. To automatically fix reported issues with cloud agents, enable autofix in the Cursor dashboard.

Reviewed by Cursor Bugbot for commit 88d2252. Configure here.

Comment thread memory/PLAN.md
kostandinang and others added 2 commits May 8, 2026 13:28
Planning PR reconciling memory/PLAN.md after FE-697 (multi-chat substrate
+ reconciliation_need queue) and FE-673 (side-chat V2 plumbing) reached
completion.

Changes:
- Promote Continuous workspace from Next to Active.
- Add two new Next items: Side-chat V2 UI trigger (closes the orphan gap
  from FE-673 where the Edit-mode button stayed stubbed), and Side-chat
  V3 hard-impact + cascade preview (uses the new reconciliation_need
  queue).
- Add Recently Completed entry for FE-673 V2 plumbing with explicit
  watch on the disabled Edit-mode button.
- Fix dependency diagram: Track A multi-chat substrate now (completed)
  with side-chat V2/V3 sub-tree; Track B continuous-workspace flipped
  from (next) to (active); orphan revisit/edit-mode horizon line
  retired (subsumed by V3).
- Rewrite narrative to record substrate as shipped, V2 as branch-complete
  with known UI-trigger gap, continuous workspace as the live frontier.
- Rotate three older completions (FE-639, FE-616, runtime JSON
  hardening) into docs/archive/PLAN_HISTORY.md under a new
  ## 2026-05-07 Sync Archive heading.

SPEC.md untouched — no embedded historical detail to prune; A79/A80 stay
marked validated since they still constrain forward work (legacy pointer
cleanup, patch-ledger extensibility).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Co-authored-by: Cursor <cursoragent@cursor.com>
@kostandinang kostandinang force-pushed the ka/fe-704-sync-substrate-v2 branch from 88d2252 to 42c109e Compare May 8, 2026 13:28
@graphite-app
Copy link
Copy Markdown

graphite-app Bot commented May 8, 2026

Merge activity

  • May 8, 1:28 PM UTC: Graphite rebased this pull request, because this pull request is set to merge when ready.

@kostandinang kostandinang added this pull request to the merge queue May 8, 2026
Merged via the queue into main with commit 87a3ca4 May 8, 2026
6 checks passed
@kostandinang kostandinang deleted the ka/fe-704-sync-substrate-v2 branch May 8, 2026 13:31
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants