Skip to content

prototype ACME delayed challenge acceptance guidance#2101

Draft
wallrj wants to merge 1 commit into
cert-manager:release-nextfrom
wallrj:wallrj/prototype-1292-hybrid-docs
Draft

prototype ACME delayed challenge acceptance guidance#2101
wallrj wants to merge 1 commit into
cert-manager:release-nextfrom
wallrj:wallrj/prototype-1292-hybrid-docs

Conversation

@wallrj
Copy link
Copy Markdown
Member

@wallrj wallrj commented May 15, 2026

Preview:

Summary

This draft PR documents the proposed ACME acceptChallengeAfter solver option for the next minor cert-manager release.

It is documentation for the code proposal in cert-manager/cert-manager#8794, which is itself a simpler follow-up to the earlier closed attempt in cert-manager/cert-manager#5006.

The docs explain:

  • what problem this is trying to solve;
  • when the option may be useful;
  • the intended behaviour;
  • an example Issuer / ClusterIssuer configuration; and
  • how this fits into ACME troubleshooting.

TODO

  • keep the docs aligned with maintainer feedback on the final field name and API shape
  • decide whether the final docs should mention both HTTP01 and DNS01 examples
  • remove prototype wording once the API is agreed
  • merge only when the corresponding cert-manager feature is accepted for the next minor release

Part of cert-manager/cert-manager#1292.

Cross-reference: cert-manager/cert-manager#8794.

Signed-off-by: Richard Wall <richard@the-moon.net>
@cert-manager-prow cert-manager-prow Bot added do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. labels May 15, 2026
@cert-manager-prow
Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
Once this PR has been reviewed and has the lgtm label, please assign hjoshi123 for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@cert-manager-prow cert-manager-prow Bot added the size/M Denotes a PR that changes 30-99 lines, ignoring generated files. label May 15, 2026
@netlify
Copy link
Copy Markdown

netlify Bot commented May 15, 2026

Deploy Preview for cert-manager ready!

Built without sensitive environment variables

Name Link
🔨 Latest commit 8fe9b0e
🔍 Latest deploy log https://app.netlify.com/projects/cert-manager/deploys/6a06ca15f2de610008ef4ab3
😎 Deploy Preview https://deploy-preview-2101--cert-manager.netlify.app
📱 Preview on mobile
Toggle QR Code...

QR Code

Use your smartphone camera to open QR code link.

To edit notification comments on pull requests, go to your Netlify project configuration.

@wallrj wallrj changed the title docs: prototype ACME delayed challenge acceptance guidance prototype ACME delayed challenge acceptance guidance May 15, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant