Skip to content

chore(deps): update tools - #712

Merged
cert-manager-prow[bot] merged 1 commit into
mainfrom
renovate/tools
Aug 22, 2026
Merged

chore(deps): update tools#712
cert-manager-prow[bot] merged 1 commit into
mainfrom
renovate/tools

Conversation

@renovate

@renovate renovate Bot commented Aug 22, 2026

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Change Age Adoption Passing Confidence Update
github.com/cli/cli/v2 v2.97.0v2.98.0 age adoption passing confidence minor
github.com/golangci/golangci-lint/v2 v2.13.0v2.13.1 age adoption passing confidence patch
k8s.io/code-generator v0.36.3v0.36.4 age adoption passing confidence patch
k8s.io/kube-openapi v0.0.0-20260721132016-d427ff9ee9adv0.0.0-20260821135717-be32def86098 age adoption passing confidence patch
kubernetes/kubernetes v1.36.3v1.36.4 age adoption passing confidence patch
redhat-openshift-ecosystem/openshift-preflight 1.20.01.21.0 age adoption passing confidence minor

Release Notes

cli/cli (github.com/cli/cli/v2)

v2.98.0: GitHub CLI 2.98.0

Compare Source

Security

A security vulnerability has been identified, and fixed, that binds the local forwarded port to all available network interfaces by default.

Users of gh codespace ports forward are advised to update gh to version v2.98.0 as soon as possible.

For more information see: GHSA-vfhh-p7hm-pxfh

Support worktrees in pr checkout

Users can now checkout a pull request into a git worktree by using the new --worktree PATH flag in gh pr checkout:

gh pr checkout 12 --worktree ../wt-feature

Add semantic search to search issues

The gh search issues command now supports semantic search for issues. Users can select the search type by passing the --search-type flag:

gh search issues --search-type semantic ...

gh search issues --search-type hybrid ...

For more information about semantic search see: "Improved Search for github issues is now generally available".

What's Changed

✨ Features
🐛 Fixes
📚 Docs & Chores
:dependabot: Dependencies

New Contributors

Full Changelog: cli/cli@v2.97.0...v2.98.0

golangci/golangci-lint (github.com/golangci/golangci-lint/v2)

v2.13.1

Compare Source

Released on 2026-08-20

  1. Linters bug fixes
    • ginkgolinter: from 0.23.1 to 0.24.0
    • gofmt: from d62b90e to e84e050
    • staticcheck: from 0.8.0-rc.1 to 0.8.0
    • wsl_v5: from 5.8.0 to 5.9.0
kubernetes/code-generator (k8s.io/code-generator)

v0.36.4

Compare Source

kubernetes/kubernetes (kubernetes/kubernetes)

v1.36.4

Compare Source

See kubernetes-announce@. Additional binary downloads are linked in the CHANGELOG.

See the CHANGELOG for more details.

redhat-openshift-ecosystem/openshift-preflight (redhat-openshift-ecosystem/openshift-preflight)

v1.21.0

Compare Source

What's Changed

Full Changelog: redhat-openshift-ecosystem/openshift-preflight@1.20.0...1.21.0


Configuration

📅 Schedule: (in timezone Europe/London)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

👻 Immortal: This PR will be recreated if closed unmerged. Get config help if that's undesired.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

Signed-off-by: renovate[bot] <29139614+renovate[bot]@users.noreply.github.com>
@renovate renovate Bot added dependencies Pull requests that update a dependency file ok-to-test labels Aug 22, 2026
@cert-manager-prow cert-manager-prow Bot added dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. labels Aug 22, 2026

@erikgb erikgb left a comment

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm
/approve

@cert-manager-prow cert-manager-prow Bot added the lgtm Indicates that a PR is ready to be merged. label Aug 22, 2026
@cert-manager-prow

Copy link
Copy Markdown
Contributor

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: erikgb

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@cert-manager-prow cert-manager-prow Bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Aug 22, 2026
@cert-manager-prow
cert-manager-prow Bot merged commit b903033 into main Aug 22, 2026
5 checks passed
@renovate
renovate Bot deleted the renovate/tools branch August 22, 2026 09:49
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. dco-signoff: yes Indicates that all commits in the pull request have the valid DCO sign-off message. dependencies Pull requests that update a dependency file lgtm Indicates that a PR is ready to be merged. ok-to-test size/S Denotes a PR that changes 10-29 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant