Skip to content

feat(report): group metrics by category in chart grid#189

Open
erhnysr wants to merge 1 commit into
base:mainfrom
erhnysr:feat/metric-grouping-in-chart-grid
Open

feat(report): group metrics by category in chart grid#189
erhnysr wants to merge 1 commit into
base:mainfrom
erhnysr:feat/metric-grouping-in-chart-grid

feat(report): group metrics by category in chart grid

39aae2b
Select commit
Loading
Failed to load commit list.
StepSecurity Actions Security / StepSecurity Required Checks succeeded Jun 6, 2026 in 0s

StepSecurity Required Checks

Finished StepSecurity Required Checks

  • NPM Package Cooldown Check - Fails if any package version in the PR was released within the configured cooldown period, helping to avoid brand-new (and potentially unreviewed or malicious) releases
  • NPM Compromised Packages Check - Checks for compromised npm package versions in the PR

Details

✅ NPM Package Cooldown Check

No npm package upgrades to recent releases found in current PR.

✅ NPM Compromised Packages Check

No Compromised npm packages are added in current PR.