Skip to content

[Release-2.74] Cherry-pick #38726 into release branch#38731

Merged
Abacn merged 1 commit into
apache:release-2.74from
Abacn:cp-38726
May 28, 2026
Merged

[Release-2.74] Cherry-pick #38726 into release branch#38731
Abacn merged 1 commit into
apache:release-2.74from
Abacn:cp-38726

[#38708] Add Flink 2.0 to SDK pipeline options validation lists (#38726)

fb5541d
Select commit
Loading
Failed to load commit list.
Sign in for the full log view

Annotations

1 warning
beam_PreCommit_Python_Runners (Run Python_Runners PreCommit 3.10)
succeeded May 28, 2026 in 56m 16s