docs: sync residual closeout SSOT (tip + analysis disposition)#1343
Conversation
|
No actionable comments were generated in the recent review. 🎉 ℹ️ Recent review info⚙️ Run configurationConfiguration used: Path: .coderabbit.yaml Review profile: CHILL Plan: Pro Plus Run ID: 📒 Files selected for processing (8)
📝 WalkthroughWalkthroughThis documentation-only update synchronizes analysis snapshots, planning references, progress tracking, and roadmap status with the delivered post-polish residual work for Phases 79–80, including closure references through ChangesPost-polish documentation closeout
Estimated code review effort: 2 (Simple) | ~10 minutes Possibly related issues
Possibly related PRs
Suggested reviewers: 🚥 Pre-merge checks | ✅ 5✅ Passed checks (5 passed)
✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
Summary
Comprehensive SSOT sync after residual Phases 79–80 landed:
df17bf7c; index section no longer implies open residual program; tracking includes docs(progress): close residual Phases 79–80 after #1340/#1341 #1342Verify
pwsh ./scripts/verify/verify-doc-ssot.ps1→ okgit diff --checkcleanOut of scope
task/super-governance-baseline(unrelated WIP; left intact)Summary by CodeRabbit