Skip to content
Open
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
1 change: 1 addition & 0 deletions docs/release_notes.rst
Original file line number Diff line number Diff line change
Expand Up @@ -14,6 +14,7 @@ Upcoming Release

.. The features listed below are not released yet, but will be part of the next release!
.. To use the features already you have to use the ``master`` branch.
* Added the specific process emissions for clinker production that are unavoidable.

* Adding `Enhanced Weathering` (or Rocks) as CDR technology. (https://github.com/PyPSA/technology-data/pull/256)

Expand Down
1 change: 1 addition & 0 deletions inputs/manual_input.csv
Original file line number Diff line number Diff line change
Expand Up @@ -544,6 +544,7 @@ cement dry clinker,lifetime,2006,30,years,2015,"JRC, 01_JRC-EU-TIMES Full model,
cement dry clinker,gas-input,2006,0.00016,MWh_NG/t_clinker,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker
cement dry clinker,electricity-input,2006,0.0694,MWh_el/t_clinker,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker
cement dry clinker,heat-input,2006,0.9444,MWh_th/t_CO2,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker
cement dry clinker,carbondioxide-output,2006,0.52,t_CO2/t_clinker,2015,"https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php", Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker
cement finishing,investment,2006,87600,EUR/t_cement/h,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx` (ICMFINPRO01, Cement finishing) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original value 10 EUR/t/year
cement finishing,FOM,2006,30,%/year,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx` (ICMFINPRO01, Cement finishing) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",
cement finishing,VOM,2006,3,EUR/t_cement,2015,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx` (ICMFINPRO01, Cement finishing) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",
Expand Down
3 changes: 2 additions & 1 deletion outputs/US/costs_2020.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3677,7 +3677,8 @@ cement carbon capture retrofit,gas-input,0.76,MWh/tCO2,"National Petroleum Counc
cement carbon capture retrofit,investment,3253638.9129,USD/(tCO2/h),"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-18, accessed 2025-04-16","Capital cost 247 million USD, CO2 Volume captured 842000 t/year",2025.0,,
cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,,
cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2025.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,,
cement dry clinker,electricity-input,0.0694,MWh_el/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker,2015.0,,
cement dry clinker,gas-input,0.0002,MWh_NG/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker,2015.0,,
cement dry clinker,heat-input,0.9444,MWh_th/t_CO2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker,2015.0,,
Expand Down
3 changes: 2 additions & 1 deletion outputs/US/costs_2025.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3757,7 +3757,8 @@ cement carbon capture retrofit,gas-input,0.76,MWh/tCO2,"National Petroleum Counc
cement carbon capture retrofit,investment,3253638.9129,USD/(tCO2/h),"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-18, accessed 2025-04-16","Capital cost 247 million USD, CO2 Volume captured 842000 t/year",2025.0,,
cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,,
cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2025.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,,
cement dry clinker,electricity-input,0.0694,MWh_el/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker,2015.0,,
cement dry clinker,gas-input,0.0002,MWh_NG/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker,2015.0,,
cement dry clinker,heat-input,0.9444,MWh_th/t_CO2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker,2015.0,,
Expand Down
3 changes: 2 additions & 1 deletion outputs/US/costs_2030.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3913,7 +3913,8 @@ cement carbon capture retrofit,gas-input,0.76,MWh/tCO2,"National Petroleum Counc
cement carbon capture retrofit,investment,3253638.9129,USD/(tCO2/h),"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-18, accessed 2025-04-16","Capital cost 247 million USD, CO2 Volume captured 842000 t/year",2025.0,,
cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,,
cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2025.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,,
cement dry clinker,electricity-input,0.0694,MWh_el/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker,2015.0,,
cement dry clinker,gas-input,0.0002,MWh_NG/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker,2015.0,,
cement dry clinker,heat-input,0.9444,MWh_th/t_CO2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker,2015.0,,
Expand Down
3 changes: 2 additions & 1 deletion outputs/US/costs_2035.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3937,7 +3937,8 @@ cement carbon capture retrofit,gas-input,0.76,MWh/tCO2,"National Petroleum Counc
cement carbon capture retrofit,investment,3253638.9129,USD/(tCO2/h),"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-18, accessed 2025-04-16","Capital cost 247 million USD, CO2 Volume captured 842000 t/year",2025.0,,
cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,,
cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2025.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,,
cement dry clinker,electricity-input,0.0694,MWh_el/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker,2015.0,,
cement dry clinker,gas-input,0.0002,MWh_NG/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker,2015.0,,
cement dry clinker,heat-input,0.9444,MWh_th/t_CO2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker,2015.0,,
Expand Down
3 changes: 2 additions & 1 deletion outputs/US/costs_2040.csv
Original file line number Diff line number Diff line change
Expand Up @@ -3937,7 +3937,8 @@ cement carbon capture retrofit,gas-input,0.76,MWh/tCO2,"National Petroleum Counc
cement carbon capture retrofit,investment,3253638.9129,USD/(tCO2/h),"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-18, accessed 2025-04-16","Capital cost 247 million USD, CO2 Volume captured 842000 t/year",2025.0,,
cement carbon capture retrofit,lifetime,20.0,years,"National Petroleum Council, Meeting the Dual Challenge - A Roadmap to At-Scale Deployment of Carbon Capture, Use, and Storage: https://dualchallenge.npc.org/files/CCUS-Chap_2-030521.pdf, p2-21, accessed 2025-04-16",,2019.0,,
cement dry clinker,FOM,4.0,%/year,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2025.0,,
cement dry clinker,VOM,6.679,EUR/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",,2015.0,,
cement dry clinker,carbondioxide-output,0.52,t_CO2/t_clinker,https://www.ipcc-nggip.iges.or.jp/efdb/ef_detail.php, Basic Search Description 'Emission factor for clinker production' EF ID 213926 Original value 0.52 per Mt clinker,2015.0,,
cement dry clinker,electricity-input,0.0694,MWh_el/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.25 PJ per Mt clinker,2015.0,,
cement dry clinker,gas-input,0.0002,MWh_NG/t_clinker,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 0.0058 PJ per Mt clinker,2015.0,,
cement dry clinker,heat-input,0.9444,MWh_th/t_CO2,"JRC, 01_JRC-EU-TIMES Full model, https://zenodo.org/records/3544900, file `SubRES_10_TECHS_CHP_SUP_IND.xlsx`, Sheet `IND` (ICMDRYPRD01, ICM.Dry Process Production.01) and currency year from file `SysSettings.xls`, sheet `Constants`, Attribute `G_Dyear` = 2015.",Original values 3.4 PJ per Mt clinker,2015.0,,
Expand Down
Loading
Loading