Expand Up @@ -83,3 +83,25 @@ Analyse the results:
2. How does the additional material improve the objective value?
3. Does RM4 inventory carry across multiple periods, or is it consumed quickly?
4. What would happen if the shipment were moved to week 5 instead of week 2?","3470065"
"max_supply_4","## Scenario

The max-supply model maximizes priority-weighted finished-goods inventory but ignores what
production costs. Finance needs to know how much supply is reachable under a fixed budget.

## Request

Add a total-cost accounting to the model from `item_costs.csv` (`unit_cost`, `holding_cost`) and
`resource_costs.csv` (`production_cost_per_hour`), defined over the model's existing variables — no
new decisions:

```
total_cost = sum over procured i, period t of buy[i,t] * unit_cost[i] (procurement)
+ sum over all items i, period t of inventory[i,t] * holding_cost[i] (holding)
+ sum over (process p, resource r), period t of x[p,r,t] * hours_per_unit[p] * production_cost_per_hour[r] (production)
```

Constrain `total_cost <= 9149.8` and re-solve for the model's existing objective (maximize
priority-weighted finished-goods inventory at the end of the horizon) on the sample dataset
(10 periods).

Report the resulting optimal objective value.","2660000"
Original file line number Diff line number Diff line change
@@ -0,0 +1,29 @@
## Scenario

Our max-supply model maximizes priority-weighted finished-goods inventory at the end of the
horizon — but it spends freely to do it. Procuring more raw material, running resources longer,
and carrying inventory all cost money (`item_costs.csv` has per-item `unit_cost` and `holding_cost`;
`resource_costs.csv` has `production_cost_per_hour`), and the base objective ignores all of it.

Finance now wants the cost side on the table. There is **no agreed exchange rate** between a unit of
finished-goods supply and a dollar of cost — pushing supply up raises cost, and the right balance is
a judgment call, not a number we can hand the solver up front. So the answer finance needs isn't a
single plan; it's the tradeoff laid out so they can choose where to sit.

## Request

1. Bring cost into the picture as a reporting quantity built from `item_costs.csv` and
`resource_costs.csv` over the model's existing variables — no new decisions.

2. Give finance the **whole supply-vs-cost tradeoff**, not one plan and not a single blended
objective: show how much finished-goods supply each budget level buys, from a tight budget up to
where more money stops buying more supply.

3. Solve on the sample dataset (10 periods) and present it so finance can act: the tradeoff curve,
the rate at which supply is bought as the budget loosens and where that rate falls off (the knee),
what drives cost at the high-supply end, and two or three candidate operating points to choose
between — without calling any one of them "best."

Watch two things about this model so the numbers mean what you claim: it's a **MILP**, and the
finished-goods priority weights span 10000:1 — so make sure your marginal rate is valid for the model
class and your supply figures are in terms finance can read, not just the weighted total.