Skip to content

chore(release): prepare 0.0.11#215

Merged
DavidBabinec merged 1 commit into
mainfrom
chore/release-0-0-11
Jul 11, 2026
Merged

chore(release): prepare 0.0.11#215
DavidBabinec merged 1 commit into
mainfrom
chore/release-0-0-11

Conversation

@DavidBabinec

Copy link
Copy Markdown
Contributor

What changed

  • bump the package version and add the 0.0.11 changelog
  • update every intentional deployment image pin to 0.0.11
  • make the maintainer checklist enumerate all release version surfaces

Why

Prepare the verified main line for the v0.0.11 tag, GHCR image, and portable deployment bundle.

Release verification

  • bun install --frozen-lockfile
  • bun run build
  • bun test (6,233 passed, 0 failed)
  • bun run lint
  • bunx tsc -b --pretty false
  • bun run test:e2e (159 passed, 0 failed)
  • fresh SQLite owner lifecycle from merged main: setup, sign-out/sign-in, edit, save/reload, password-step-up publish, anonymous public render, and unpublished-draft isolation
  • bun run release:bundle -- 0.0.11
  • bundle SHA-256: f2d169a2be08a5af90a936504cd2a4f8a90d8cf1ddffc4aa62519cce0da4e337

@DavidBabinec DavidBabinec merged commit 0d5e4b6 into main Jul 11, 2026
9 checks passed
@DavidBabinec DavidBabinec deleted the chore/release-0-0-11 branch July 11, 2026 19:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant