Collection of information on Run 3 analyses. Drop here whatever you find relevant. Let's try to have things organized.
- PWG JE meeting - September 2023 - https://indico.cern.ch/event/1326439/
- PWG HF - https://indico.cern.ch/event/1326524/
- O2 Analysis Tutorial - November 2023 - https://indico.cern.ch/event/1326201/
Links I found useful to figure out run status
- Figure out what period a run belongs to https://alimonitor.cern.ch/hyperloop/runlists
- Spreadsheet(!!) for QA status in Pb-Pb https://docs.google.com/spreadsheets/d/1vsl-pkLdUoNXZm6muPyMENWdDSKM7UDtQLcXc2B9QhE/edit#gid=492527515
- Spreadsheet(!!) for QA status in pp https://docs.google.com/spreadsheets/d/14vXFYVx3oVE8wgJKmIBhjvAt6NpGp7D6H4AmBM9E0Cw/edit#gid=1454168024
- LHC23zzh_cpass1 - Run 544116 - TPC GOOD - ITS GOOD , but EMC not participating. Also run only 7 min long
- LHC23zzh_cpass1 - Run 544126 - same as above but EMCal also not participating
- FJ suggestion: LHC23zzk_cpass0 - Run 544451, roughly 30min run. Looking at QA it looks like TPC, ITS and EMCal have status good! Roughly 29khz interaction rate and 45mio inelastic events
- on-the-fly bad channel correction → works (in the past this had to be done manually in Run2!)
- on-the-fly time calibration → works
- energy calib on-the-fly works but with PDG pi0 energy, wrong E/p → now corrected for energy loss using MC, even better than in Run2, very differential → calibration available for new apass that is starting now. Starting with pp 2023, then Pb-Pb, then pp 2022
- hardware triggers are working in 2023 data. With hardware triggers almost 100% lifetime (full lumi)
- for MB not full lumi, lifetime about 5% (in pp) , in Pb-Pb 100% lifetime
- framework side analysis
- m02 etc all there
- MC labels are there on cell level, not yet on cluster level. PR pending
- track matching in principle working, apart from tracking problems that impact track propagation (we have to see with new reconstruction passes)