This document defines the rules and criteria for participating in the Simultaneous Release. The simultaneous release occurs each year in March, June, September, and December. There are more criteria than when releasing at other times. There are more requirements partially because there are more projects releasing at once, so the workload needs to streamlined and made uniform. But also, the extra criteria are included by mutual agreement between projects (via their representatives to Planning Council) so that as a whole, the release will be of better quality, maintainability, and improved consumability.
The spirit of this document is not be so much as a "contract" of what has to be done to release, but instead a statement of what minimally is necessary to make the release good, if not great! While each Project does their individual things to make the release great, this document describes how we, as a group, do that by our voluntary agreement to participate and provide these minimum requirements. We are always open to better documentation and more meaningful agreements, so please feel free to make suggestions on how to make our release better from year to year (preferably through your Planning Council representative). Changes may be made to this document throughout the development cycle for clarity or to improve reference links.
To allow for some flexibility for special cases, exceptions to these requirements are allowed, but to provide balance and foster good communication, any exceptions to the items or deadlines must follow the Planning Council Exception Process.
The requirements are divided into three categories:
- Mandatory requirements in order to participate in the simultaneous release. Some of those are required to be completed early in the release cycle.
- Mandatory requirements to be part of the common software repository and, consequently, the minimum requirements to be part of an EPP package.
- Optional requirements that improve adoption and demonstrate good Eclipse Citizenship, following "the Eclipse Way". These are requirements you do not have to fulfill, but are recommended, encouraged, and the thing that you do have to do is to document if and how you do them.
The requirements and conditions stated in this section are the basic minimum required for a project to claim they are part of the Simultaneous Release. Some of those are required to be completed early in the release cycle.
A project can join the Simultaneous Release at any release cycle during the year.
Note that the list of projects that participate in the simultaneous release is determined by aggregation files in the aggregation repository. Participating projects must keep their
aggrconfiles up-to-date.
Every project team must designate one or more committers to represent the interests of the project in matters related to the simultaneous release. These representatives must subscribe to the simrel-devlist mailing list.
For projects that did not participate in the previous simultaneous release, the project team's representative must state the project's intent to do so via the simrel-dev mailing list before the milestone 1 (M1) date of the release.
For projects that did participate in the previous simultaneous release,
the project team's representative must touch the project's aggrcon file by the milestone 2 (M2) date of the release to indicate that the project wishes to continue participating
and that the project team is paying attention.
Projects are required to follow the Eclipse Development Process and to contribute only fully vetted intellectual property. In the interest of enabling the assembly of cohesive products from the content contributed to the simultaneous release, projects are generally expected to conform to the Eclipse UI Guidelines.
A project representative can declare the project team's intent to drop-off the simultaneous release at any time by sending a note to the simrel-dev mailing list.
Note that marking an
aggrconfile as disabled is considered a temporary state. Theaggrconmust be removed from the repository for any project that has decided to leave the simultaneous release.
If you have any questions, please contact your PMC's Planning Council Representative, or the EMO.
The requirements in this section were historically called "the must do" items; they are a "must" not for the release, but must be met for a project to be in the common, central repository. The common repository is for end users to discover easily and therefore (per EPP Policy) are the minimum requirements to be included in EPP Packages. The criteria in this section are designed to make sure projects work relatively well, work well together, and can be installed together. This is especially required for adopters who may be using these projects in complicated, interwoven ways so each piece of the puzzle must fit together well and be dependable and be maintainable, as well as being on time and IP clean.
First-time participants are expected to be in an aggregation build by M1, at the latest. Then, once in, always in. This firstly means by agreeing to be in the simultaneous release. But, even more than that it is assumed that once you are in one Simultaneous Release, you will continue to be, so the following cycle, it is assumed you will be in M1.
Note: There is an implicit "opt-in" assumed when we start a new development stream. That is, projects will be left enabled when we start a new release cycle. But if projects appear to not be active, the Planning Council will first try to contact the Project and their PMC. If no response and no release record in place by M2, then they will be disabled or removed.
Put another way, being part of the Simultaneous Release is not a "one time" activity, covering only the release part of the development cycle. Instead, it is a commitment to stay "simultaneous" on an on-going basis. Once in, if a project decides to not be part of future simultaneous releases, they need to communicate that widely, and as early as possible, since it could affect adopters or downstream projects.
While part of the mechanics of contributing to the build, it is required that any contribution to the Simultaneous Release repository be done by a unique change to the aggrcon file. There are two ways to do this. First, your contribution repository can point to a simple repository where you know for sure there is only one version of your contribution available. Second, your contribution repository can be a composite repository but then you name exactly which versions to include. That is you need to specify all 4 version fields. You can, of course, do both methods, simple repository and name exact versions, if you want the safety of that redundancy.
At least one person from each project in a Simultaneous Release must subscribe to simrel-dev mailing list, since that is the primary communication channel for issues related to the Simultaneous Release
Your representative to the Planning Council, either from PMC or Strategic Member, must attend Planning Council meetings and represent you there. Presumably, of course, after meeting or communicating with you and the other projects they represent, so they can fairly bring forward concerns and vote on issues that affect all projects, if required. Put another way, by committing to be in the Simultaneous Release, you agree to abide by all the Planning Council decisions and rules, so be sure your representative understands your project and your situation.
A build-team member or release engineer from each project must be "on call" during the aggregation or integration periods to make sure any issues can be addressed quickly.
Projects must use 4-part version numbers following the common semantics described in the Eclipse version numbering document.
All plug-ins (that contain Java code) must correctly specify their Bundle Required Execution Environment (BREE). Resource-only bundles do not need a BREE since it doesn't matter which version of Java they are used with.
- The maximum BREE up to and including the 2022-06 release is Java 11..
- Starting in 2022-09, BREE up to and including Java 17.
- Starting in 2024-06, BREE up to and including Java 21.
- And, going forward, the first Eclipse SimRel release to allow an LTS will be 6-9 months later.
All plug-ins contributed to SimRel must be signed with Eclipse Foundation provided keys. The signing can be completed with Jar signing, or PGP signing, or both if desired.
The Eclipse Foundation makes a centralized Eclipse Certificate available to all projects that can be used for Jar signing. The Jar signing can be done using the centralized Eclipse Certificate which is accessible using the Eclipse CBI Maven plug-in.
Jars should generally be Jar signed only by their original creator and should not be re-signed by other projects.
The Eclipse Foundation provides individual PGP keys for each project that allows projects to sign their deliverables, including Eclipse Plug-ins.
The signing can be done with the Tycho GPG plug-in. For details on obtaining PGP keys for your project see the IT Infrastructure section on PGP signing.
This is the main methodology to sign third-party content contributed to SimRel, but can be used for Eclipse content too. See the Eclipse Orbit project for more information about consuming third-party content in SimRel.
Projects must use jarred plug-ins (with unpack=false) unless there are technical reasons not to, i.e., require the directory form.
Use standard forms of license documents so they are displayed in the most usable, and concise way during install and update. It is a normal requirement to use a standard Eclipse Foundation "about" template, but where those templates are edited by each project, care must be taken to be sure they are edited in similar ways. That is, substantial differences are fine, if required, but we need to avoid minor differences based on case, dates, and formatting. Note that the Eclipse Foundation's license or user agreement files may change from year to year. It is easier to point to a "symbolic" representation of the license, that is inserted at build time, so it will be accurate with less manual updates from each project, see EPL License Feature for details.
Any third-party plug-ins that are common between projects must be consumed via Eclipse Orbit, or if available from Maven Central as an OSGi artifact, maybe be consumed directly from Maven Central, in which case it should be PGP signed and not Jar signed. Third party libraries must not be repackaged as bundles and distributed with a bundle symbolic name that has the potential to conflict with a bundle symbolic name used by another project.
The Simultaneous Release must avoid unnecessary duplicate third-party libraries. Note that this only applies to versions of the libraries; thus if project A requires foo.jar 1.6 and project B uses foo.jar 1.7, that's to be avoided but is OK if there is a good reason, e.g., if the bundle does not use proper semantic versioning. Different service versions are generally not OK, such as 1.7.1 vs 1.7.2; those should be explained, if required. A qualifier-only difference is definitely not OK.
The reports labeled
Oomph Report
on the CI instance provide details about duplicates:
https://ci.eclipse.org/simrel/
It's been common practice to include third-party bundles in a feature.xml:
<plugin id="org.apache.commons.commons-codec" version="0.0.0"/>
The p2 metadata induced from an include has, by design, a very restricted version range:
<required namespace='org.eclipse.equinox.p2.iu' name='org.apache.commons.commons-codec' range='[1.16.0,1.16.0]'/>
This restricts the requirement to match exactly and only the one, specific version available during the build. This approach is appropriate for the project's own provided content, but when many projects do this for a third-party dependency and are building against different versions of that third-party dependency, we end up with duplicates in SimRel. Not only are duplicates generally redundant, sometimes when the duplicates are actually installed simultaneously, they cause wiring problems at runtime that breaks the provided functionality.
Even worse, if a CVE is discovered for a third-party bundle, it's not possible to update an installation to remove the old bundle and replace it with a newer version without the feature provider also building a newer feature version that includes the newer bundle version. The inability to respond quickly to a security vulnerability is something that we must strive to avoid by ensuring that the version-range constraints on every third-party bundle is as wide as is semantically sensible.
It is significant to note too that bundle includes are generally redundant,
i.e., if something (a bundle) actually requires the third-party bundle,
it will declare that requirement in the MANIFEST.MF
with an appropriate semantic version-range constraint.
So the third-party bundle will be installed as required regardless of what the feature specifies,
and with the necessary flexibility to update to a newer version without also updating the bundle that requires it.
As such, including non-project bundles in features is not just discouraged, it is forbidden. Projects will be given time to adapt, but the Planning Council may choose to disable a project for violating this rule at its discretion.
Often includes are specified to ensure that the bundle is aggregated by Tycho into the p2 update site. In order to ensure the project's p2 site is sufficiently complete with respect to transitive requirements, a project can take one of the following approaches:
- Specify additional bundles directly in the
category.xml, uncategorized. - Define a
dependenciesfeature, include the bundle in that feature, specify that feature in thecategory.xml, uncategorized, and do not contribute the feature to SimRel nor use it for any other purpose than in thecategory.xml. - Use advanced features of Tycho to include all transitive dependencies while filtering out the ones provided by other sites.
Each major project (as determined by participating PMCs) must have an 'About' dialog icon with hover text that displays the provider name. Every plug-in and feature must specify a descriptive provider-name (for features), or Bundle-Vendor header (for plug-ins), as determined by the project's PMC, e.g., "Eclipse Modeling Project" rather than "Eclipse.org". Also, Projects should contribute to the welcome page when appropriate.
Projects must work together in any combination of any install. Put another way, this means that users can install any subset of the projects participating in Simultaneous Release, and each of the installed projects will work as well as if it had been installed independently. If such a problem is identified, the affected projects must track down and fix the problem, to be in the simultaneous release repository.
It is required that participating projects document whether or not they support updating from one release to the next. For example, from Neon (2016) to Oxygen (2017). [The current implementation plan for tracking, details TBD (see ), is for there to be a field in the PMI Release Record that must be checked "Yes" or "No".] To meet this requirement in the affirmative:
- The project will accept bugs as valid if an update does not work, or there is a functional problem after updating.
- The project will test such updates.
- The project will document, such as in a "Migration Guide" or "Release Notes", any details about what does or does not work across yearly updates.
For example, a user's workspace may be "migrated" to the new release and not be usable by the old release after the update (but projects freshly checked out or imported would continue to work with either). Or, perhaps there are some known cases where some preference setting would be lost and have to be set again by the user.
Please note, this requirement is about documenting a project's policy. As of this writing (for Oxygen) it is possible for a project to simply document "No, updates from previous releases are not supported". In the future, after more experience is gained, it is anticipated that it will be required to support "continuous updates" even across each boundaries. The only reason we do not make it required at this point in time is that we are not sure we understand all the implications. Accordingly, has been opened to document "requirements or issues" that participating projects are aware of or find in support of this effort.
The items in this category are, in a sense, optional. That is, what, exactly, is done by a project is optional, but it is required for projects to document what they do. These are often "best practices" that many projects have found essential at driving good adoption, plus the items sometimes speak to the quality of the project (quality as an Eclipse "good citizen", as opposed to their code quality or architecture). But, their importance is not as universally relevant to all projects and their adopters, hence it is only required that each project document what they do for these items, but exactly what they do is up to the best judgment of the project and their community.
Exceptions for any rule or schedule can be made if there are good enough reasons to do so. This same exception process will be followed for things like "requests to respin" a build after a deadline. The process to get any exception must be open and well-documented and follow these steps:
- The Project's PMC must approve the request for an exception and it is the PMC (not the lone Project or committer) that makes the request to the Planning Council. The Planning Council member that represents the PMC is the one to bring the issue forward to the Planning Council.
- The exception requires at least 3 positive votes from active Planning Council members and no negative votes. When time is a factor, e.g., requests for rebuilds, the deadline for voicing a negative vote is basically by the time 3 votes are documented. But when time is not a factor, such as when requesting an exception to one of the criteria, then a period of one week will pass before being final, to allow times for concerns or negative votes to be voiced even after 3 positive votes. If there are not enough positive votes within one week, then the request for exception will be considered 'failed'. Note that "3" was chosen under the assumption that the Planning Council member representing the PMC would vote for it, since that PMC must approve it initially, so that means 2 others must also vote for it, for 3 total.
Depending on the timing, the issue and votes will be documented in either the Planning Council Meeting minutes, or on the Planning Council mailing list.