Skip to content

Latest commit

 

History

History
123 lines (112 loc) · 3.76 KB

File metadata and controls

123 lines (112 loc) · 3.76 KB
NameAboutLabelsAssignees
Bug ReportCreate a report to identify and fix a bugbug,gitauto

What is the bug? What is currently happening?

Include any logs such as error objects, stack traces, or console logs.

Add any screenshots such as error messages or unexpected behavior.

When did the issue last occur?

How can we reproduce the bug?

What do you expect to happen?

If you have any idea what might be causing the issue, describe it.

Describe your device or server.

Describe your operating system.

  • For Mac, check in "About This Mac".
  • For Windows, check in "Settings" > "System" > "About".
  • For iOS, check in "Settings" > "General" > "About" > "iOS Version".
  • For Linux, run uname -a in the terminal.
  • For your server, specify the provider such as AWS EC2, AWS Lambda, or etc.

Describe your browser.

  • For Chrome, "Chrome, Version 126.0.6478.127 (Official Build) (arm64)". Check in "3 dots" on the top right > "Help" > "About Google Chrome".
  • For Safari, "Safari, Version 17.5 (19618.2.12.11.6)". Check in "Safari" on the top left > "About Safari".
  • For non-browser issues, type "Server-side" or "Mobile App".

Include any other context or information.