Skip to content

Commit 6652552

Browse files
committed
Add Team Charlie EOD closeout report
1 parent c2a7b0f commit 6652552

1 file changed

Lines changed: 96 additions & 0 deletions

File tree

Lines changed: 96 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,96 @@
1+
# Team Charlie EOD Report
2+
3+
Date: 2026-06-26
4+
Team: Charlie
5+
6+
## Summary
7+
8+
Team Charlie EOD closeout completed as an operational reporting pass.
9+
10+
No new feature implementation was performed. No runtime behavior, UI behavior, API behavior, database behavior, or unrelated files were changed.
11+
12+
## PRs Reviewed
13+
14+
| PR | Title | State | Merge Result |
15+
| --- | --- | --- | --- |
16+
| #219 | PR_26177_CHARLIE_009-sprites-legacy-audit-plan | Open draft, mergeable=false, no reviews | Not merged |
17+
| #220 | PR_26177_CHARLIE_010-sprites-api-db-foundation | Open draft | Not merged |
18+
| #221 | PR_26177_CHARLIE_011-sprites-tool-shell | Open draft | Not merged |
19+
| #222 | PR_26177_CHARLIE_012-sprites-library-crud | Open draft | Not merged |
20+
| #223 | PR_26177_CHARLIE_013-sprites-import-preview-metadata-palette | Open draft | Not merged |
21+
| #224 | PR_26177_CHARLIE_014-sprites-tags-categories-search | Open draft | Not merged |
22+
| #225 | PR_26177_CHARLIE_015-sprites-reference-protection | Open draft | Not merged |
23+
| #226 | PR_26177_CHARLIE_016-sprites-playwright-final-polish | Open draft | Not merged |
24+
| #227 | PR_26177_CHARLIE_017-sprites-toolbox-entry-active | Open draft | Not merged |
25+
| #228 | PR_26177_CHARLIE_018-sprites-testable-mvp-completion | Open draft | Not merged |
26+
27+
## PRs Merged
28+
29+
None.
30+
31+
## Merge Order
32+
33+
No merges were performed. The dependency-order merge gate stops at PR #219 because it is still draft, mergeable=false, and has no recorded review approval.
34+
35+
## Required Reports And ZIPs
36+
37+
| Check | Result | Notes |
38+
| --- | --- | --- |
39+
| PR reports written | PASS | Reports are present for PRs #219-#228. |
40+
| Branch validation reports | PASS | Present for PRs #219-#228. |
41+
| Requirement checklist reports | PASS | Present for PRs #219-#228. |
42+
| Validation lane reports | PASS | Present for PRs #219-#228. |
43+
| Manual validation notes | PASS | Present for PRs #219-#228. |
44+
| Repo ZIP artifacts | PASS | Local ZIP artifacts are present under `tmp/` for PRs #219-#228. |
45+
46+
## Branch Validation
47+
48+
PASS
49+
50+
The repository was returned to `main`, pulled from `origin/main`, and verified clean/synced before this report branch was created.
51+
52+
## Repository Status
53+
54+
PASS
55+
56+
Main branch baseline before the report branch:
57+
58+
- Branch: `main`
59+
- Worktree: clean
60+
- Local/origin sync: `0 0`
61+
- Main commit: `c2a7b0fdbf16f2a8275c70bf92336a3dc928106f`
62+
63+
## Validation Summary
64+
65+
- PASS: EOD project instruction review.
66+
- PASS: GitHub PR state reviewed.
67+
- PASS: PR #219 review status checked; no reviews recorded.
68+
- PASS: Report presence check for PRs #219-#228.
69+
- PASS: ZIP presence check for PRs #219-#228.
70+
- PASS: No runtime files changed by this EOD report.
71+
- PASS: No UI files changed by this EOD report.
72+
- PASS: No API files changed by this EOD report.
73+
- PASS: No database files changed by this EOD report.
74+
- PASS: No `start_of_day` files changed.
75+
76+
## Manual Validation Summary
77+
78+
Manual closeout confirmed that Team Charlie should not merge the Sprites stack until PR #219 is ready, mergeable, and approved. Later Sprites PRs remain dependent on the earlier stack order and should not be merged out of order.
79+
80+
## Outstanding Backlog
81+
82+
Sprites:
83+
84+
- Interactive canvas/grid editor
85+
- Width/height controls
86+
- Palette/Colors integration (reference only)
87+
- Pixel painting
88+
- Save/load sprite pixel data
89+
- Preview polish
90+
- Animation support (future)
91+
92+
## EOD Result
93+
94+
PASS with blocked merges.
95+
96+
The repository closeout is operationally clean. Charlie implementation merges remain pending because the first Sprites PR in dependency order is not merge-ready.

0 commit comments

Comments
 (0)