Skip to content

Commit 4c58903

Browse files
committed
Use the individual commit comment generated for each PR. Do not squash PR_26152_134 through PR_26152_138 into a single commit.
1 parent 1cb5f9d commit 4c58903

10 files changed

Lines changed: 1198 additions & 0 deletions
Lines changed: 83 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,83 @@
1+
# Wave 3 Migration Closeout
2+
3+
PR: PR_26152_138-wave-3-migration-closeout
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Closed out Wave 3 migration validation.
9+
- Validated migration objectives completed.
10+
- Documented remaining blockers.
11+
- Did not begin sample rebuild.
12+
13+
## Wave 3 Tools
14+
15+
- `asset-studio`
16+
- `game-builder`
17+
- `game-design-studio`
18+
- `publish-studio`
19+
- `animation-studio`
20+
- `particle-studio`
21+
- `sound-studio`
22+
- `ai-assistant`
23+
- `code-studio`
24+
- `input-studio`
25+
- `localization-studio`
26+
27+
## Migration Objectives
28+
29+
| Objective | Status | Notes |
30+
| --- | --- | --- |
31+
| Contract baseline | PASS | Wave 3 tool contracts validate. |
32+
| ProjectWorkspace integration | PASS | Launch/open/save/close boundaries validate. |
33+
| Tool State boundary | PASS | Active Tool State ownership, invalid payload rejection, and no mutation validate. |
34+
| Reporting normalization | PASS | Reports use PASS/FAIL/WARN/SKIP and ProjectWorkspace terminology. |
35+
| Wave 1 / Wave 2 reopening | SKIP | Prior waves remain closed; no direct blocker was found. |
36+
| Samples | SKIP | Samples remain pending rebuild. |
37+
| Future tools | SKIP | Additional future/unidentified tools remain out of scope. |
38+
39+
## Validation
40+
41+
Command:
42+
43+
```powershell
44+
node tests/shared/Wave3MigrationCloseoutValidation.test.mjs
45+
```
46+
47+
Result: PASS.
48+
49+
Additional targeted Wave 3 validation files covered by the closeout suite:
50+
51+
- `tests/shared/Wave3ToolContractBaselineValidation.test.mjs`
52+
- `tests/shared/Wave3ProjectWorkspaceIntegrationValidation.test.mjs`
53+
- `tests/shared/Wave3ToolStateBoundaryValidation.test.mjs`
54+
55+
## Lanes Executed
56+
57+
- contract - targeted Wave 3 validation suite.
58+
- recovery/UAT - Wave 3 migration closeout only.
59+
60+
## Lanes Skipped
61+
62+
- runtime - no tool runtime code changed.
63+
- engine - no engine code changed.
64+
- samples - SKIP / pending rebuild.
65+
- Wave 1 - SKIP / already closed.
66+
- Wave 2 - SKIP / already closed.
67+
- future tools - SKIP / out of scope.
68+
69+
## Samples Decision
70+
71+
SKIP / pending rebuild. No samples were touched.
72+
73+
## Tools Decision
74+
75+
Only Wave 3 tools were validated. Wave 1 and Wave 2 remain closed, and additional future/unidentified tools remain SKIP / out of scope.
76+
77+
## Remaining Blockers
78+
79+
None found for Wave 3 validation scope.
80+
81+
## Playwright
82+
83+
Playwright impacted: No.
Lines changed: 74 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,74 @@
1+
# Wave 3 ProjectWorkspace Integration
2+
3+
PR: PR_26152_135-wave-3-projectworkspace-integration
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Integrated Wave 3 tools with ProjectWorkspace lifecycle validation.
9+
- Validated launch/open/save/close participation.
10+
- Validated no hidden defaults.
11+
- Validated no silent fallback.
12+
13+
## Wave 3 Tools
14+
15+
- `asset-studio`
16+
- `game-builder`
17+
- `game-design-studio`
18+
- `publish-studio`
19+
- `animation-studio`
20+
- `particle-studio`
21+
- `sound-studio`
22+
- `ai-assistant`
23+
- `code-studio`
24+
- `input-studio`
25+
- `localization-studio`
26+
27+
## Results
28+
29+
| Area | Status | Notes |
30+
| --- | --- | --- |
31+
| Launch boundary | PASS | Every Wave 3 tool launches with explicit ProjectWorkspace, manifest, and Tool State inputs. |
32+
| Invalid launch rejection | PASS | Missing manifest and silent fallback launch payloads reject visibly. |
33+
| Open lifecycle | PASS | Every Wave 3 tool participates in explicit ProjectWorkspace open boundaries. |
34+
| Save lifecycle | PASS | Every Wave 3 tool saves through the active Tool State reference. |
35+
| Close lifecycle | PASS | Every Wave 3 tool releases active tool references on close. |
36+
| Tool runtime validation | SKIP | Runtime UAT remains a future lane and was not claimed. |
37+
| Samples | SKIP | Samples remain pending rebuild. |
38+
39+
## Validation
40+
41+
Command:
42+
43+
```powershell
44+
node tests/shared/Wave3ProjectWorkspaceIntegrationValidation.test.mjs
45+
```
46+
47+
Result: PASS.
48+
49+
## Lanes Executed
50+
51+
- integration - affected Wave 3 ProjectWorkspace validation only.
52+
53+
## Lanes Skipped
54+
55+
- runtime - no tool runtime behavior changed.
56+
- engine - no engine code changed.
57+
- samples - SKIP / pending rebuild.
58+
- recovery/UAT - handled by PR_26152_138 closeout only.
59+
60+
## Samples Decision
61+
62+
SKIP / pending rebuild. No samples were touched.
63+
64+
## Tools Decision
65+
66+
Only Wave 3 tools from the prior Future activation backlog were validated. Wave 1 and Wave 2 were not reopened.
67+
68+
## Playwright
69+
70+
Playwright impacted: No.
71+
72+
## Blocker Scope
73+
74+
No Wave 3 ProjectWorkspace integration blockers found.
Lines changed: 68 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,68 @@
1+
# Wave 3 Reporting Normalization
2+
3+
PR: PR_26152_137-wave-3-reporting-normalization
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Normalized Wave 3 validation reports.
9+
- Used standard PASS/FAIL/WARN/SKIP reporting.
10+
- Used ProjectWorkspace terminology.
11+
- Kept samples as SKIP / pending rebuild.
12+
13+
## Normalized Reports
14+
15+
- `docs/dev/reports/wave_3_tool_contract_baseline.md`
16+
- `docs/dev/reports/wave_3_projectworkspace_integration.md`
17+
- `docs/dev/reports/wave_3_toolstate_boundary_validation.md`
18+
- `docs/dev/reports/wave_3_reporting_normalization.md`
19+
- `docs/dev/reports/wave_3_migration_closeout.md`
20+
21+
## Results
22+
23+
| Area | Status | Notes |
24+
| --- | --- | --- |
25+
| PASS/FAIL/WARN/SKIP language | PASS | Reports use the standard status vocabulary. |
26+
| ProjectWorkspace terminology | PASS | Current ProjectWorkspace terminology is used throughout. |
27+
| Samples decision | PASS | Samples are marked SKIP / pending rebuild. |
28+
| Tool runtime claims | PASS | Reports do not claim tool runtime UAT passed. |
29+
| Wave 1 / Wave 2 reopening | SKIP | Prior waves remain closed unless a direct blocker appears. |
30+
31+
## Validation
32+
33+
Command:
34+
35+
```powershell
36+
git diff --check
37+
```
38+
39+
Result: PASS.
40+
41+
## Lanes Executed
42+
43+
- docs/report normalization only.
44+
45+
## Lanes Skipped
46+
47+
- contract - no additional contract behavior changed in this PR.
48+
- runtime - no runtime behavior changed.
49+
- integration - no tool runtime integration changed.
50+
- engine - no engine code changed.
51+
- samples - SKIP / pending rebuild.
52+
- recovery/UAT - handled by PR_26152_138 closeout only.
53+
54+
## Samples Decision
55+
56+
SKIP / pending rebuild. No samples were touched.
57+
58+
## Tools Decision
59+
60+
Only Wave 3 report language was normalized. Wave 1, Wave 2, samples, and future/unidentified tools remain out of scope.
61+
62+
## Playwright
63+
64+
Playwright impacted: No.
65+
66+
## Blocker Scope
67+
68+
No Wave 3 reporting blockers found.
Lines changed: 80 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,80 @@
1+
# Wave 3 Tool Contract Baseline
2+
3+
PR: PR_26152_134-wave-3-tool-contract-baseline
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Established contract baseline for Wave 3 migrated tools.
9+
- Verified ProjectWorkspace ownership boundaries.
10+
- Verified manifest ownership boundaries.
11+
- Added no tool feature additions.
12+
- Performed no sample work.
13+
14+
## Wave 3 Source
15+
16+
Wave 3 uses the prior planning Future activation backlog from `PR_26152_120-tool-migration-prioritization`.
17+
18+
## Wave 3 Tools
19+
20+
- `asset-studio`
21+
- `game-builder`
22+
- `game-design-studio`
23+
- `publish-studio`
24+
- `animation-studio`
25+
- `particle-studio`
26+
- `sound-studio`
27+
- `ai-assistant`
28+
- `code-studio`
29+
- `input-studio`
30+
- `localization-studio`
31+
32+
## Results
33+
34+
| Area | Status | Notes |
35+
| --- | --- | --- |
36+
| Tool contract baseline | PASS | Each Wave 3 tool has a valid shared tool contract. |
37+
| ProjectWorkspace ownership boundary | PASS | ProjectWorkspace contexts remain coordination-only and do not own payloads. |
38+
| Manifest ownership boundary | PASS | Manifest handoff validates declared fields and rejects runtime payload ownership. |
39+
| Wave 1 / Wave 2 reopening | SKIP | Prior waves remain closed; no direct blocker required reopening them. |
40+
| Tool feature additions | SKIP | No feature additions in this PR. |
41+
| Samples | SKIP | Samples remain pending rebuild. |
42+
| Future tools | SKIP | Additional unidentified or future tools remain out of scope. |
43+
44+
## Validation
45+
46+
Command:
47+
48+
```powershell
49+
node tests/shared/Wave3ToolContractBaselineValidation.test.mjs
50+
```
51+
52+
Result: PASS.
53+
54+
## Lanes Executed
55+
56+
- contract - affected Wave 3 contract validation only.
57+
58+
## Lanes Skipped
59+
60+
- runtime - no runtime behavior changed.
61+
- integration - no tool runtime integration changed.
62+
- engine - no engine code changed.
63+
- samples - SKIP / pending rebuild.
64+
- recovery/UAT - handled by PR_26152_138 closeout only.
65+
66+
## Samples Decision
67+
68+
SKIP / pending rebuild. No samples were touched.
69+
70+
## Tools Decision
71+
72+
Only the eleven Wave 3 tools listed above were validated. Additional future/unidentified tools remain SKIP / out of scope.
73+
74+
## Playwright
75+
76+
Playwright impacted: No.
77+
78+
## Blocker Scope
79+
80+
No Wave 3 contract blockers found.
Lines changed: 74 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,74 @@
1+
# Wave 3 Tool State Boundary Validation
2+
3+
PR: PR_26152_136-wave-3-toolstate-boundary-validation
4+
Date: 2026-06-02
5+
6+
## Scope
7+
8+
- Validated Tool State boundaries for Wave 3 tools.
9+
- Validated invalid payload rejection.
10+
- Validated no payload mutation.
11+
- Validated active Tool State ownership.
12+
13+
## Wave 3 Tools
14+
15+
- `asset-studio`
16+
- `game-builder`
17+
- `game-design-studio`
18+
- `publish-studio`
19+
- `animation-studio`
20+
- `particle-studio`
21+
- `sound-studio`
22+
- `ai-assistant`
23+
- `code-studio`
24+
- `input-studio`
25+
- `localization-studio`
26+
27+
## Results
28+
29+
| Area | Status | Notes |
30+
| --- | --- | --- |
31+
| Tool State contract | PASS | Every Wave 3 Tool State validates with owner, project, visibility, status, and version. |
32+
| Active ownership | PASS | Each active Tool State links back to the matching Wave 3 tool contract. |
33+
| Invalid payload rejection | PASS | Missing payload, fallback/sample payload, and tool type mismatch scenarios reject. |
34+
| Payload mutation | PASS | Validation does not mutate incoming Tool State payloads. |
35+
| Portable exports | PASS | Tool State portable exports remain valid and scoped. |
36+
| Samples | SKIP | Samples remain pending rebuild. |
37+
38+
## Validation
39+
40+
Command:
41+
42+
```powershell
43+
node tests/shared/Wave3ToolStateBoundaryValidation.test.mjs
44+
```
45+
46+
Result: PASS.
47+
48+
## Lanes Executed
49+
50+
- contract - affected Wave 3 Tool State validation only.
51+
52+
## Lanes Skipped
53+
54+
- runtime - no tool runtime behavior changed.
55+
- integration - no tool runtime integration changed.
56+
- engine - no engine code changed.
57+
- samples - SKIP / pending rebuild.
58+
- recovery/UAT - handled by PR_26152_138 closeout only.
59+
60+
## Samples Decision
61+
62+
SKIP / pending rebuild. No samples were touched.
63+
64+
## Tools Decision
65+
66+
Only Wave 3 tools from the prior Future activation backlog were validated. Wave 1 and Wave 2 were not reopened.
67+
68+
## Playwright
69+
70+
Playwright impacted: No.
71+
72+
## Blocker Scope
73+
74+
No Wave 3 Tool State blockers found.

0 commit comments

Comments
 (0)