Skip to content

Latest commit

 

History

History
100 lines (74 loc) · 4.83 KB

File metadata and controls

100 lines (74 loc) · 4.83 KB

AgentHub Progress Tracker

Task: post-polish residual hardening — complete (docs authority + mobile hubClient strangler) Started: 2026-07-16 (Visual polish); residual program 2026-07-20; closed 2026-07-21 Last Updated: 2026-07-21 Mode: GITHUB_FULL Repo: TokenDanceLab/AgentHub

Progress index (no open residual program)

Item Value
Active SPEC None — residual Phases 79–80 closed; pick next from roadmap P0/P1
Closed residual analysis post-polish-project-overview · module-inventory · risk-assessment
Closed residual plan task-breakdown · dependency-graph · milestones
Strategy (delivered) Strangler Fig — thin mobile hubClient + docs authority; no big-bang rewrite; no static Visual QA chase past 89
Tracking Issues #1335–#1339 (closed) · GH milestones 98–99 (closed) · PRs #1340 / #1341 / #1342

Residual phases (closed 2026-07-21)

Phase Name Milestone Issues Status
79 Docs Authority + Gates Hygiene 98 #1335 #1336 closed · PR #1340
80 Mobile hubClient Strangler 99 #1337 #1338 #1339 closed · PR #1341 (737→342 LOC Proxy thin)

Closed polish phases (2026-07-20)

Phase Name Status
73 Engineering loop host ports + import entry closed
74 Light frosted glass + Visual QA closed
75 HiDPI fidelity + typography closed
76 Chat + Inspector density closed
77 Agents density + blank browser + terminal dock closed
78 A11y focus + Glass border/shadows/elevation + CI path-filter closed

Historical cleanup-baseline plan under docs/plan/task-breakdown.md (and siblings) is HISTORICAL only — not live backlog.

No open residual-program phases. Next work: pick from roadmap P0/P1 (E2E contract, chat reliability, deploy-only security evidence) — not static Visual QA past 89.

Product tip & Visual QA

Product tip: 1ac86aa5 (post #1340–#1343) Gate: 89/100 — 🟢🟢🟢 SHIP Gate history: 55 → 76 → 79 → 82 → 84 → 85 → 87 → 88 → 89

Dimension grid (7/9 maxed)

Dim Score Max Status
Glass 18 18
Hierarchy 14 14
Spacing 14 14
Light 12 12
Dark 8 8
A11y 8 8
Empty 5 6 ⏳ multi-state needed
Type 9 10 ⏳ zh refinement
Motion 9 10 ⏳ interactive eval

References: visual-qa-scorecard · rescore-17-final · _archive/

Methodology ceiling

Remaining 3pt (Type/Motion/Empty) require interactive testing, multi-state data, or multi-component CJK font changes — beyond static 1440×810 screenshot evaluation. Do not chase gate past 89 under residual program.

Infrastructure & gates hygiene

CI path-filter

  • Unified changes job (dorny/paths-filter@v3) in .github/workflows/checks.yml
  • Go-only PR skips frontend CI; CSS-only PR skips Go CI
  • Estimated savings: up to ~20 CI minutes per PR

Backend perf / leak gates (T79.2 evidence)

Item State Note
scripts/verify/verify-backend-perf-leak-gates.ps1 PASS (behavior + short microbench) Not production capacity
backend-performance-gates.md Active owner (dated 2026-06-27) Evidence classes: behavior / microbench / load smoke / pprof
Capacity claim Not claimed Load smoke / pprof still path-specific; no “production capacity proven” language

Optional future: wire script as workflow_dispatch only — not every PR (see residual risk assessment T5).

Explicit out of scope (residual)

  • Live OIDC / secret rotation / packaged Desktop evidence
  • Full Mobile UI redesign
  • Static Visual QA gate chase past 89
  • Edge handlers further split without concrete API change

Session Log

Date Summary
2026-07-20 🟢🟢🟢 Ship 89 — polish Phases 73–78 closed; CI path-filter; docs rescore archive
2026-07-20 SDD Phase 0–1: post-polish analysis trio committed
2026-07-21 Residual program delivered: Phase 79 #1340 + Phase 80 #1341; milestones 98–99 closed; hubClient ~342 LOC
2026-07-21 Closeout #1342 + SSOT sync #1343 · tip 1ac86aa5; analysis inventory marked delivered
2026-07-21 CI: mobile light path-filter + backend perf/leak workflow_dispatch (T5)