Skip to content

Latest commit

 

History

History
50 lines (39 loc) · 1.74 KB

File metadata and controls

50 lines (39 loc) · 1.74 KB

Best Practices

Comprehensive guides for deploying, operating, and optimizing Pangolin in production.

Guides

Operations

  • Deployment - Production deployment strategies, Docker, Kubernetes, HA setup
  • Scalability - Scaling API servers, databases, multi-tenancy, performance optimization
  • Security - Authentication, encryption, audit logging, compliance

Data Management

Technical

  • Apache Iceberg - Table design, partitioning, schema evolution, performance tuning
  • Generic Assets - Managing ML models, files, media, and other artifacts

Quick Reference

Deployment Checklist

  • Infrastructure provisioned
  • Secrets configured in secrets manager
  • Database initialized
  • Monitoring and alerting configured
  • Backup procedures tested
  • Load testing completed

Security Checklist

  • HTTPS/TLS enabled
  • Strong JWT secrets
  • Database encryption enabled
  • Firewall rules configured
  • Audit logging enabled
  • Regular security patches

Performance Checklist

  • Appropriate partitioning strategy
  • Connection pooling configured
  • Caching enabled
  • Regular compaction scheduled
  • Metrics monitored

Getting Help